Once a fire sprinkler system has been chemically cleaned and treated, it is important to test chemical levels within that system. Huguenot Labs has several different test kits for titration testing. To ensure the proper chemical treatment levels, testing should be done every 3 months to 6 months. This monitoring will stop MIC and microbiological corrosion from attacking your fire sprinkler systems